The 16th International Architecture Exhibition 2018 (May 26th – November 25th) curators: Yvonne Farrell and Shelley McNamara
2017 June 9th – Yvonne Farrell – in the Jury of the arcVision Prize – and Shelley McNamara titled the 16th International Architecture Exhibition Freespace, and explained their choice with the following words:
Project: New University Campus for UTEC Lima
Lima, Peru
2013 – Planning Obtained
Grafton Architects
Lima is a city build on a desert, 12 degrees south of the Equador. A cold current from Antartica, called the Humboldt Current, keeps the climate pleasantly temperate. A white sea fog blankets coastal parts of Lima at certain times of the year. UTEC has designed a billboard that creates clean drinking water from atmospheric humidity.
There are 40 m hight cliffs onto the Pacific Ocean that define the edge of the city. The site of the University is close by, enjoying on-shore breezes. We imagined a man-made “cliff”. The north face of the campus acts as “cliff” or “shoulder” to the fast-moving city. We positioning its structure along the busy motorway, to be visible to passing traffic and register in the public mind. We imagined a Univesity as an Arena for Learning.
Lima Perù, Huaca Pucllana, platform pyramid made of individual, hand-made, clay bricks and adobe, Lima.
Huaca Pucllana en Miraflores, Perù Photograph by McKay Savage, 2012 (cropped)
Lima Perù Modern city Skyline, Photograph by Flickr user Seacat
Vertical Campus.
Roofs of lecture rooms and laboratories are terraced to become cascading gardens, reminiscent of the cultivated terraces around Lake Titicaca. Landscape is woven into the building.
Structure
The main structural rhythm of the institu-reinforced concrete is a 20m centres, with an intermediate structure at 10 m centres. Ribbed beams form the soffits. A “folded” concrete wall along the motorway forms and articulated screen at the base of the “new cliff”.
1. Structural asymmetric drawing by Shell Arquitectos, 2014 2. Stairs construction drawing by Shell Arquitectos, 2014 3. Screenshot of UTEC BIM model by ID and BIM International, 2014 4. Motorway wall photographs by Shell Arquitectos, 2014 5. Motorway wall drawing by Shell Arquitectos, 2014
Construction Phase
The building emerges from the excavated ground. The structural matrix emerges as the construction progresses. With a team of nearly a thousand men and using three cranes, the construction of Phase 1 is completed.
Due to the curved nature of the site, each 20m structural rhythm adjusts itself to the outer rim. There is no long vista. Instead, a series of intriguing spaces form a type of spatial “chain”.
Indian architect Anupama Kundoo returns to the Arsenale this year with a full- scale installation of a low-cost house and prefab toilet, supported by Fondazione Pesenti.
ANUPAMA KUNDOO Building Knowledge: an inventory of strategies
Official participant in ‘Reporting from the Front’
Biennale Architettura di Venezia 2016
26th May 2016 – Open to the public from Saturday May 28th to Sunday November 27th 2016 at the Giardini and the Arsenale, the 15th International Architecture Exhibition, titled REPORTING FROM THE FRONT, will be directed byAlejandro Aravena and organized by La Biennale di Venezia chaired by Paolo Baratta.